Fabiano Brothers

Distribution Facility Expansion & Renovation

The Fabiano Brothers, Inc. distribution facility expansion and renovation project added more than 87,000 SF of Controlled Environment Warehouse (CEW), Recycling and Repack space and renovated much of their existing CEW, Loading and Draft Cooler areas.

The existing warehouse facility built in 2006 consisted of insulated tilt-up construction. S. M. Wilson determined in a pre-construction phase analysis that insulated pre-cast panels would be a more cost effective, timely and constructible solution for this project all while maintaining the architectural features of the existing facility.

S. M. Wilson’s past experience with beverage distribution facilities ensured that Fabiano could continue operating effectively and safely during construction. The project allowed Fabiano to continue growing their business and improve their operational efficiency.