Permanent Party Barracks Phase III

US Army Corps of Engineers

The Permanent Party Barracks III project consisted of the design and construction of 27 barracks units. The units house 270 soldiers. Each 3,660 SF building consists of five apartment units, totaling 98,820 SF for the entire project.

Each unit was constructed in a 1+1 configuration with a shared kitchen and dining area. Additionally, each building features a shared central exterior walkway and covered porches for each unit. The 11.5 acre site also includes parking lots, two basketball courts, one sand volleyball court, six horseshoe pitching courts and 14 picnic pavilions.

This LEED Gold certified project includes several sustainable features, including: alternative transportation options (public transportation and bicycle storage), a stormwater management plan, water efficient landscaping, optimal energy performance, an indoor air quality program, using low VOC (Volatile Organic Compound) emitting materials and using locally manufactured materials.

S. M. Wilson & Co.